If you're a mechanical contractor quoting a commercial job in Victoria, a dependable HVAC estimation service for commercial contractors can be the difference between winning the tender and leaving margin on the table. Rushed takeoffs and guessed heat loads cost more than they save, especially on multi-storey, multi-department, or tightly programmed commercial builds. Vic Air's estimation and design service gives contractors accurate ducting takeoffs, material specification, and lead-time visibility before a quote goes out the door, whether the job needs a supply-only quote or a full supply-and-fabrication quote. Here's how the service works, what to send us to get started, and how it supports every commercial vertical we serve.
Our HVAC estimation service for commercial contractors is built around four core outputs, each aimed at getting an accurate, defensible number in front of your client faster, without you needing to hire your own HVAC estimator:
A full ducting takeoff service covering duct runs, transitions, plenums, and fittings, sized from your drawings rather than estimated on-site.
Our engineers work through the mechanical services specification to produce a ducting design that meets project intent, not just a generic system.
A detailed material specification and bill of materials, so your quote reflects the exact components the job needs, not a rough allowance.
Realistic lead time advice against your build program, so you know before you quote whether stock and fabrication capacity can meet the deadline.
The single biggest factor in how quickly we can turn around a commercial HVAC quote is the quality of the project brief we receive. A complete brief lets our team move straight to the takeoff instead of chasing missing information.
Scaled PDF plans, plus elevations or sections for commercial jobs where ceiling void or riser space is tight.
The mechanical services specification or schedule, so we can quote to spec rather than guess intent.
Confirmation of what's in and out of scope, including any staged or staged-trade delivery constraints.
The tender due date or required delivery window, so lead times are built into the quote from the start.
Contractors quoting commercial projects generally choose between two quote types, and the right one depends on how standard (or not) the ducting run is.
| Supply-only quote | Supply-and-fabrication quote | |
|---|---|---|
| What it covers | Standard ducting, fittings, and components picked from stock | Custom sheet metal ductwork fabricated to project-specific runs, transitions, and geometry |
| Best suited to | Straightforward runs that match standard sizing | Non-standard layouts, isolation rooms, riser ducts, retrofits, and tight-tolerance builds |
| Lead time | Faster, limited to stock availability | Built around fabrication capacity and project program |
| Where Vic Air fabricates | Not applicable | In-house at our Keilor Park facility |
Most commercial jobs end up needing a mix of both: standard components where the run is straightforward, and in-house sheet metal ductwork where the layout is not. Our estimation team flags which parts of a job need fabrication before the quote goes out, so there are no surprises at rough-in.
The same estimation and design service sits behind every commercial vertical Vic Air supplies, from schools to hospitals. Each sector has its own compliance and design demands, but the quoting process starts the same way: drawings in, accurate takeoff out.
Ducting design for classroom wings, gymnasiums, and staged school and TAFE builds, priced around AS 1668.2 and term deadlines.
Zoning and infection-control-ready ducting for retirement living and aged care builds running 24/7.
Riser ducting and apartment-by-apartment zoning for multi-residential towers.
Ducting for hospital, day surgery, and medical centre projects, covering infection control ventilation and isolation room requirements.
Whichever vertical your project sits in, the same commercial HVAC ducting supplier hub and HVAC estimation service team support the quote from first drawing to final delivery.
Our load estimation approach is informed by AIRAH's DA09 (Air Conditioning Load Estimation and Psychrometrics), the industry reference manual for Australian air conditioning load calculations.
A commercial HVAC ducting estimate starts with your drawings and mechanical specification. Vic Air's engineers complete a ducting takeoff, specify materials, and confirm lead times against your build program, then return a quote and materials list you can build your bid from. The process is the same across supply-only and supply-and-fabrication jobs.
Turnaround depends on project complexity and current fabrication capacity, but Vic Air's estimation team prioritises fast, accurate quoting for tender-stage work. Getting your plans and mechanical specification to us as soon as the tender pack lands gives the most time to return a considered quote.
Yes. Vic Air's HVAC design and estimation team also services regional Victoria and southern NSW from our Keilor Park, Dandenong South, and Shepparton branches, covering commercial and domestic projects alike.
A ducting takeoff service covers every duct run, transition, plenum, and fitting sized from your drawings, along with a complete bill of materials. It replaces on-site guesswork with a defensible, itemised list your quote can be built from.
It depends on the layout. Supply-only suits standard runs that match off-the-shelf sizing. Supply-and-fabrication suits non-standard layouts, such as isolation rooms, risers, or retrofits, where ducting needs to be custom-made in-house.
Send your plans and mechanical specification to Vic Air's HVAC estimation service and get a ducting takeoff, material specification, and lead-time advice back before your tender is due.
Get a quote© Copyright 2025 Vic Air Supplies | Websites with MOBLE