Could not find "Short"
ACCESSORIES
DIFFUSION
EVAPORATIVE
FITTINGS
REFRIGERATION
SHEETMETAL
THERMAL DUCT
THERMOSTATS
UNITS
VENTILATION
ZONING
UNIT BRANDS
Get a free $20 voucher if you order more than $100 today. Get it now while stocks lasts only until today only
OUR PRODUCTS
MEGA MENU
FEATURED PRODUCTS
ACCESSORIES
DIFFUSION
EVAPORATIVE
FITTINGS
REFRIGERATION
SHEETMETAL
THERMAL DUCT
THERMOSTATS
UNITS
VENTILATION
ZONING
Vic Air supplies HVAC and dehumidification ducting for aquatic centres, pools, and leisure facilities in Victoria, working directly with mechanical contractors on council and leisure-operator construction and upgrade projects. As an aquatic centre air conditioning ducting supplier operating from three branches, we fabricate and supply ducting engineered around the corrosion resistance, dehumidification, and condensation control that chlorinated, high-humidity pool environments demand, across Melbourne and regional Victoria.
Victoria's council and leisure-operator aquatic centre pipeline covers new builds and ageing-facility upgrades alike, and pool ducting supply in Victoria carries corrosion and moisture-management constraints that standard commercial ducting supply does not always account for.
Corrosion-resistant materials. Chlorinated, high-humidity pool air attacks standard galvanised ducting over time, so aquatic centre ductwork needs a material specification, grade, coating, and jointing, engineered for constant moisture and chemical exposure.
Dehumidification system ducting. Pool halls run dedicated dehumidification systems alongside standard HVAC, and the ducting supporting them needs to be sized and sealed to handle sustained high-moisture airflow without failure.
Condensation control. Poorly specified ducting in a pool hall condensates on cool surfaces, so insulation and vapour-barrier detailing need to be built into the ducting supply from the start, not added after installation problems appear.
AS 1668.2 wet area ventilation. Pool halls, change rooms, and plant areas fall under wet-area ventilation requirements, and ducting needs to support the air-change rates and moisture extraction these spaces require.
Our Keilor Park facility fabricates custom sheet metal ductwork, transitions, and fittings on-site, supporting the non-standard material specification aquatic centres need, from corrosion-resistant jointing to dehumidification ducting runs. Because fabrication is in-house, we can turn ducting around fast around the live-site construction constraints typical of council and leisure-operator upgrade projects, without waiting on third-party fabrication shops.
Aquatic centres typically combine pool halls, change rooms, cafes, and function spaces on one site. iZone zoning solutions allow individual space control, supporting the varied heat loads and occupancy patterns typical of leisure facilities while managing energy use across a site that runs long operating hours.
Our HVAC estimation service gives contractors accurate, fast quoting for aquatic centre project tenders, working from drawings before construction begins, so mechanical contractors can price council and leisure-operator projects with confidence at procurement stage.
Wet area ventilation for pool halls, change rooms, and plant rooms is set out in AS 1668.2, the ventilation and air conditioning standard used across Victorian commercial and leisure construction. Our team keeps this context in mind when supplying and fabricating ducting for aquatic centre and pool projects.
Q1. What HVAC ducting is needed for an aquatic centre or pool project in Victoria?
Aquatic centre and pool projects need HVAC and dehumidification ducting for aquatic centres in Victoria that's engineered for corrosion resistance, condensation control, and AS 1668.2 wet-area ventilation. Vic Air supplies and fabricates this ducting for council and leisure-operator construction and upgrade projects across the state.
Q2. Does Vic Air supply ducting only, or also fabricate for aquatic and leisure projects?
Both. Vic Air supplies standard commercial hvac ductwork and fabricates custom, corrosion-resistant ducting in-house at our Keilor Park facility, covering the dehumidification runs and non-standard jointing common in pool hall and leisure centre builds, without relying on third-party fabrication.
Q3. Can Vic Air's ducting handle chlorinated, high-humidity pool air?
Yes. Our team specifies and fabricates ducting materials engineered for constant moisture and chemical exposure, supporting the dehumidification system ducting and condensation control that pool hall environments demand.
Q4. How does iZone zoning suit aquatic and leisure centres?
iZone allows individual space control, which suits the pool hall, change room, cafe, and function-room layouts typical of leisure facilities, rather than one system serving a site with very different heat loads and occupancy patterns as a single zone.
Q5. Does Vic Air supply aquatic centre HVAC ducting Melbourne-wide, or regional Victoria too?
Yes. Vic Air supplies aquatic centre HVAC ducting Melbourne-wide and into regional Victoria and southern NSW, from branches in Keilor Park, Dandenong South, and Shepparton.
Talk to our commercial team about ducting supply, fabrication, and estimation for your next aquatic centre, pool, or leisure facility project across Victoria.
Explore our commercial HVAC ducting supplier hub to see every industry we serve →
© Copyright 2025 Vic Air Supplies | Websites with MOBLE